E-services
1 General safety provisions
1.1 Obligations and responsibilities
1.2 How to read these instructions
1.3 Description of safety symbols
2 Product description
2.1 Väderstad E-Services
2.2 Overview
2.3 Gateway
2.4 Using dual terminals
2.4.1 Switching between MASTER and SLAVE
2.5 Software
3 Assembly instructions
3.1 Mounting the iPad holder in the tractor
3.2 Connection with Ethernet cable (optional)
3.3 Connecting to ISOBUS
3.4 Connecting to tractors without ISOBUS connectors
3.5 E-Keeper
3.5.1 Button functions
3.6 Pair the iPad with the E-Keeper
4 Get started
4.1 Connecting with E-Control
4.1.1 If the network is not found automatically
4.2 Download the E-Control application, ISOBUS/E-Control
4.3 Updating software in Gateway, ISOBUS/E-Control
5 The home screen
5.1 Display for control and monitoring
5.2 Function buttons
5.3 Navigation buttons
5.4 Machine symbol
5.5 Tank level
6 General settings
6.1 Menu settings
6.2 General settings
6.2.1 Adapting the sensors to the seed feed
6.3 Licences (SeedEye, seed counter)
6.4 External Control
6.4.1 External control off
6.4.2 ISOBUS Task Control
6.4.3 Product offset
6.4.4 Manual section control
6.4.5 Väderstad Universal Control
6.5 Tramlining
6.5.1 Tramlining ports SeedEye
6.5.2 Creating a custom tramlining program
6.5.3 Manage the tramline program
6.5.3.1 Save the tramline program
6.5.3.2 Open a saved tramline program
6.5.3.3 Delete a saved tramline program
6.5.3.4 Calculation of tramlining
6.5.3.5 Calculated tramline
6.5.3.6 Save the tramline program
6.5.4 Pre-emergence bout marking
6.6 Alarms
6.6.1 SeedEye alarms
7 Calibration
7.1 Seed
7.1.1 Calibration
7.1.2 Counter
7.1.2.1 Plant density/m2
7.1.2.2 Kg/ha
7.1.3 Setting of seed type (SeedEye)
7.2 Fertiliser (RDAC)
7.3 BioDrill (option)
7.4 Radar
7.5 Interactive Depth Control, IDC
7.5.1 Calibration of IDC – the function
7.5.1.1 Raised level
7.5.1.2 Raised level measurement value
7.5.1.3 Ground level
7.5.1.4 Activation time
7.5.1.5 Summary
7.5.2 Setting the feed output.
7.5.2.1 LowLift
7.5.2.2 Drilling depth
7.5.2.3 Feed output start
7.5.2.4 Feed stop
7.5.2.5 Summary
8 Configuration
8.1 Setting the seed distributor head
9 Statistics
9.1 Virtual level meter
9.1.1 Add product
9.2 Operating statistics
9.2.1 Trip meter
9.2.2 Total statistics
10 Use in the field
10.1 Variable sown amount
10.2 Manual feed
10.3 Setting tramlines
10.4 Bout marker switching
10.5 Auto advance
10.6 Lift stop
10.7 LowLift
10.8 Seed depth IDC
10.9 Wing folding
10.9.1 1 Start
10.9.2 Raising the machine.
10.9.3 Unfolding
10.9.4 Alignment
10.9.5 Retraction/folding up
10.9.6 Sequence complete
10.9.7 Stopping because speed is too high
11 SeedEye
11.1 Overview
11.2 SeedEye box
11.3 SeedEye activation
11.4 Registering SeedEye boxes
11.4.1 Setting SeedEye:
11.4.2 System test
11.5 Setting blockage sensitivity and flow sensitivity.
11.5.1 Blockage sensitivity
11.5.2 Flow sensitivity
11.5.3 Detection of low flow in the entire section
11.6 Sensors
11.6.1 Adjusting the sensors
11.7 Seed calculation
11.7.1 Limitations in row spacing SeedEye
11.7.2 Setting the application rate
12 Alarms
12.1 Display
12.1.1 Alarm menu
12.1.2 Alarm levels
12.2 Alarm list
13 Electrical system
13.1 RDA 400S
13.2 RDA 600–800S
13.3 RDA 600–800C
14 Troubleshooting
14.1 ACU6
15 Information
15.1 Alarm history
15.2 Workstation, inputs and outlets
15.3 SeedEye information
16 Download instructions and video
16.1 Viewing on iPad
16.2 Updating previously downloaded files
16.3 Delete instructions or video
17 Release notes