E-services
1 General safety provisions
1.1 Obligations and responsibilities
1.2 How to read these instructions
1.3 Description of safety symbols
2 Product description
2.1 Väderstad E-Services
2.2 Overview
2.3 Gateway
2.4 iPad (E-Control)
2.5 Software
2.6 E-Keeper
2.6.1 Button functions
3 Assembly instructions
3.1 Mount E-keeper in the tractor
3.2 Fitting the iPad in the E-Keeper
3.3 Mounting the iPad holder in the tractor
3.4 Connection with Ethernet cable (optional)
3.5 Connecting to ISOBUS
3.6 Connecting to tractors without ISOBUS connectors
3.7 Pair the iPad with the E-Keeper
4 Get started
4.1 Connecting with E-Control
4.1.1 If the network is not found automatically
4.2 Download the E-Control application, ISOBUS/E-Control
4.3 Updating software in Gateway, ISOBUS/E-Control
5 The home screen
5.1 Display for control and monitoring
5.2 Function buttons
5.3 Navigation buttons
5.4 Machine symbol
5.5 Tank level
6 General settings
6.1 Menu settings
6.2 General settings
6.3 External Control
6.3.1 External control off
6.3.2 ISOBUS Task Control
6.3.3 Product offset
6.3.4 Väderstad Universal Control
6.4 Tramlining
6.4.1 Creating a custom tramlining program
6.4.2 Managing track program
6.4.3 Save the tramline program
6.4.4 Open a saved tramline program
6.4.5 Delete a saved tramline program
6.5 Alarms
6.5.1 Alarm settings
6.5.2 Alarms menu
6.5.3 Alarm levels
6.6 Hydraulic following harrow
6.7 AutoPilot/AutoCheck (accessory)
6.7.1 General settings for AutoPilot
6.7.2 AutoCheck
6.7.3 Limitations
6.7.3.1 Hydraulic system requirements, tractor
6.7.4 Basic system settings
6.7.5 System test
6.7.6 Driving with AutoPilot
7 Calibration
7.1 Seed
7.1.1 Calibration
7.1.2 Counter
7.1.2.1 Plant density/m2
7.1.2.2 Kg/ha
7.2 Fertiliser
7.3 BioDrill
7.4 Radar
7.5 Machine height sensor (LLS)
7.5.1 Calibrating the machine height sensor (LLS)
7.5.1.1 Raised level
7.5.1.2 Raised level measurement value
7.5.1.3 Ground level
7.5.1.4 Summary
7.5.2 Setting the feed output.
7.5.2.1 LowLift
7.5.2.2 Feed output start
7.5.2.3 Feed stop
7.5.2.4 Summary
7.6 Oil flow
7.6.1 Calibration procedure
8 Configuration
8.1 Setting when replacing level sensors
9 Statistics
9.1 Virtual level meter
9.1.1 Add product
9.2 Operating statistics
9.2.1 Trip meter
9.2.2 Total statistics
10 Use in the field
10.1 Variable sown amount
10.2 Setting tramlines
11 Information
11.1 Alarm history
11.2 WorkStation, inputs and outputs.
12 Alarm list
13 Electrical system
13.1 RD 300 – 400 S/C
14 Download instructions and video
14.1 Viewing on iPad
14.2 Updating previously downloaded files
14.3 Delete instructions or video
15 Release notes